2022
- Foundation of Fitec (Tianjin) Machinery Co. Ltd, for production of FINSTERWALDER machinery for the Chinese market
- Supply of technical equipment for a food waste digestion plant in Xian, China
- Supply of technical equipment for a food waste processing plant in Shenzen, China
- Further development of the slide gate pump KS23 to a larger variant KS32
2021
- Design and delivery of the technical equipment for a food waste and biowaste fermentation plant in Urumqi, China
- Design and supply of technical equipment for an avocado waste biogas plant in Guadalajara, Mexiko
2020
- Enlargement of gas storage capacities and enabling flexible electricity generation with a second CHP at the company location in Bernau, Germany
- Planning, expansion and machine delivery for a waste fermentation plant in Grimsby, Canada
- Machine delivery for a waste fermentation plant Zoo Share in Toronto, Canada
- Planning and technical equipment of a food waste treatment plant in Xiqing, China
- Planning and technical equipment of a food waste treatment plant in St. Catharines, Canada
- Planning and technical equipment of a food waste treatment plant in Yongjia, China
2019
- Construction and expansion of the company’s own waste fermentation plant to thicken and process fermentation product at the company location in Bernau, Germany
- Using ammonium sulphate solution (ASL) as fertilizer of the company’s own plant in Bernau, Germany
- Extension of the dry fermentation with an external heat exchanger in Bergrheinfeld, Germany
- Machine delivery for a waste fermentation plant in Anröchte, Germany
2018
- Planning and component delivery for an experimental biogas plant in Lennoxville, Canada
- Planning for waste treatment biogas plant Zoo Share in Toronto, Canada
- Component delivery and gradual modernization of the waste biogas plant Kaiserwinkel, Austria
2017
- Completion of the rehabilitation of the landfill Pill
- Completion of the rehabilitation of diesel damage at train station in Gmunden, Germany
- Commissioning of Jiangjin plant in Chongqing, China
2016
- Planning and component delivery for a food waste treatment in Pickering, Canada
- Planning and component delivery for a food waste biogas plant in Maryland, Canda
- Retrofitting of a floor scraper in a steel fermenter in Beringen, Switzerland
- Developmentof a floor scraper for fermenters without concrete cover, Further development of the ball valve pump
- Founding and Partnership with Fitec (Tianjin) Environmental Technology, China
2015
- Technical equipment and extension of an existing biowaste digestion plant in Plymouth, England
- Technical equipment of a biowaste digestion plant in Bayview, Canada
- Development of a floor scraper for digesters without concrete cover; Further development of the ball valve pump
- Development and construction of the first external skimmer
2014
- Planning and technical equipment of a food waste fermentation plant in Chongqing, China
2013
- Cooperation with ibk Bioanalytik GmbH, further development of bicarbonate measurement technology for monitoring process biology in biogas plants
- Development and construction of the first ball valve pump
2012
- Planning and construction of two municipal biowaste digestion plants in Germany
- Cooperation with Huadu Green Environmental Group Ltd. from China
2011
- First foreign projects in England and Luxembourg
2010
- First foreign projects in England and Luxembourg
2008/2009
- Cooperation with Yield Energy from Canada
- Commissioning of ventilation for diesel damange at Train station Gmunden, Deutschland
2006/2007
- Construction of the first two biogas plants according to the FINSTERWALDER procedure
- Sale of the food waste collection to EHG Recycling
2005
- Start of remediation of the landfill pill by means of specific ventilation
2004
- Based on our own experience, Finsterwalder Umwelttechnik starts offering planning services for biogas projects
- Development and patenting of a first hydraulic separation press in cooperation with Putzmeister Industrietechnik
2000 till 2003
- Beginning of the remediation of the landfill Weiden West by means of water balance layer
- Construction of a food waste collection in Munich area to supply its own biogas plant
- Construction and commissioning of the company’s biogas plant for the recovery of approx. 6,000 tonnes of food waste per year
- Development and construction of the first skimmer
1998 /1999
- Planning our own biogas plant
- Development of the “DESiVariation” program for emission limit value analysis
1997
- Foundation of Finsterwalder Umwelttechnik by Dipl.-Ing. Tobias Finsterwalder and Dr.-Ing. Klemens Finsterwalder