Projects

Moos­burg - Sewage Treat­ment Plant Germany
Moosburg Sewage Treatment Plant Germany
Year Feed
2021, 2008, 2005 75 m³/d cen­trate from waste water sludge;
69 kg/d nitro­gen reduction
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
2021
  • Machine deliv­ery
  • Tech­ni­cal and bio­log­i­cal monitoring

2008

  • Process Scheme & Design
  • Con­struc­tion management
  • PLC pro­gram­ming
  • Com­mis­sion­ing

2005

  • Redesign waste pro­cess­ing process
  • Approval plan­ning
  • Envi­ron­men­tal impact rating
  • 1x Bicar­bon­ate Analyzer
Urumqi - Organ­ic Waste Treat­ment Sys­tem (Chi­na)
3D Modellbild
Year Feed
2021 109,500 tonnes/yr
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Machine deliv­ery
  • com­mis­sion­ing support
  • 2x Gate Valve Pump KS23
  • 2x ball valve pump KV20
  • 4x sep­a­ra­tion press BS20
  • 3x Floor scraper
  • 3x skim­mer
  • 3x Sub­mersible pump
  • 3x Agi­ta­tor
  • 3x over/underpressure valve
Nokia - Com­mer­cial and Indus­tri­al Pack­age Biowaste Squeez­ing Equip­ment (Fin­land)
Year Feed
2020 4,000 tonnes/yr;
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Machine deliv­ery
  • com­mis­sion­ing support
  • 1x Sep­a­ra­tion Press BS20
  • 1x Gate Valve Pump KP10
Bioen­ergie Kaiser­winkel - Bio­gas Plant (Aus­tria)
Biogas Plant Kaiserwinkel Austria
Year Feed
2020, 2019, 2007 5,000 tonnes/yr; Munic­i­pal SSO, restau­rant food waste
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
2020
  • Process Scheme & Design
  • Instal­la­tion

2019

  • Machine deliv­ery
  • Instal­la­tion
  • Com­mis­sion­ing

2007

  • Pre­lim­i­nary design
  • Approval plan­ning
  • Process Scheme & Design
  • Machine deliv­ery
  • PLC pro­gram­ming
  • Com­mis­sion­ing
  • 1x Gate Valve Pump KP10
  • Sep­a­ra­tion Press BS20
  • Gate valve pump KS23
  • Sep­a­ra­tion Press
  • Dou­ble-tube heat exchanger
  • Floor scraper
  • Sed­i­ment separator
  • Skim­mer
Yongjia - Food­waste Treat­ment Sys­tem (Chi­na)
Yongjia Foodwaste Treatment System China

default

Year Feed
2020 36,500 tonnes/yr; Com­mer­cial food waste from restaurants
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Process design support
  • Machine deliv­ery
  • Remote Com­mis­sion­ing
  • 1x Gate Valve Pump KS23
  • 2x Sep­a­ra­tion Press BS20
  • 1x Gate Valve Pump KP10
  • 2x Floor scraper
  • 2x Skim­mer
  • 2x Sub­mersible pump
  • 2x Agi­ta­tor
  • 2x over/underpressure valve
Escarp­ment Renew­ables - Bio­gas Plant (Cana­da)
Escrapment Renewables Biogas Plant Canada

DCIM100MEDIADJI_0119.JPG

Year Feed
2019 35,000 tonnes/yr; Pre­pared com­mer­cial food waste from restau­rants and gro­cery stores
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Process Scheme & Design
  • Machine deliv­ery
  • Instal­la­tion
  • Remote Com­mis­sion­ing
  • 4x Ball Valve Pump KV20
  • 2x Pas­teur­iz­er
  • 6x Food Waste pas­teur­iz­er tanks
  • 2x Skim­mer
Xiqing - Food­waste Pre-Treat­ment Sys­tem (Chi­na)

Separation Press BS20

Year Feed
2019 76,000 tonnes/yr; Com­mer­cial food waste from restaurants
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Process design support
  • Machine deliv­ery
  • Remote Com­mis­sion­ing
  • 4x sep­a­ra­tion press BS20
  • 2x Gate Valve Pump KS23
  • 4x Gate Valve Pump KP10
David­son Envi­ron­men­tal (Cana­da)
Compact pre-treatment unit Davidson Environmental
Year Feed
2019 12,000 tonnes/yr; Com­mer­cial food waste from restaurants
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Process Scheme & Design
  • Remote Com­mis­sion­ing
Com­pact pre-treat­ment unit with
  • 2x sep­a­ra­tion press BS20
  • 2x Gate Valve Pump KP10
Toron­to ZooShare Bio­gas Coopar­a­tive Zoo Toron­to (Cana­da)

ZooShare Biogas Cooperative Toronto Zoo Canada

Year Feed
2019 12,000 tonnes/yr; Com­mer­cial and munic­i­pal food waste
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Process Scheme & Design
  • Machine deliv­ery
  • remote com­mis­sion­ing an organ­ic waste pre-treat­ment and trans­fer station.
  • Floor scraper
  • Sed­i­ment separator
  • Skim­mer
  • Pas­teur­iza­tion
  • 2x ball valve pump KV20
  • 2x dou­ble tube heat exchanger
  • Hyg­e­niza­tion tanks for food waste
Dry Diges­tion Roth­müh­le - Bio­gas Plant (Ger­many)

Dry AD Rothmühle

Year Feed
2019, 2014 25,000 tonnes/yr; Munic­i­pal leaf and yard waste, organ­ic waste and com­mer­cial food waste from gro­cery stores, restau­rants and food processors
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines

2019

  • Machine deliv­ery
  • Instal­la­tion
  • Com­mis­sion­ing

2014

  • Approval plan­ning
  • Process Scheme & Design
  • Machine deliv­ery
  • Instal­la­tion
  • Com­mis­sion­ing
  • Dou­ble-tube heat exchanger
  • 2x sep­a­ra­tion press BS20
  • 1x Ball Valve Pump KV20
  • 1x Dou­ble-tube Heat Exchanger
  • 2x Floor scraper
  • Sed­i­ment separator
  • 2x Skim­mer
Anröchte - Dry Diges­tion Plant (Ger­many)

Anröchte Dry Digestion Plant Germany

Year Feed
2019 22 m³/h Green Waste with 25% TS. 60 mm par­ti­cle size
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Machine deliv­ery
  • Instal­la­tion
  • Com­mis­sion­ing
  • 2x Gate Valve Pump KS23
  • 1x Hydraulik Pow­er pack
Lana - Bio­gas plant (Italy)
Lana Biogas Plant Itally
Year Feed
2018 32,000 tonnes/yr munic­i­pal organ­ic waste and food waste
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Process Scheme & Design
  • Machine inte­gra­tion
  • Machine deliv­ery
  • Instal­la­tion
  • Com­mis­sion­ing
  • 2x ball valve pump KV20
  • 4x dou­ble tube heat exchanger
  • 4x floor scraper
  • 2x sed­i­ment separator
  • 3x skim­mer
  • Boost­er station
Cour­t­house Hill Farms - Bio­gas plant (Cana­da)

Courthouse Hill Farms Canada

Year Feed
2017 15,000 tonnes/yr munic­i­pal organ­ic waste
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Process Scheme & Design
  • Machine inte­gra­tion
  • Machine deliv­ery
  • Com­mis­sion­ing
  • 2x ball valve pump KV20
  • 2x dou­ble tube heat exchanger
  • Hyg­e­niza­tion tanks for food waste
  • Floor scraper
  • Sed­i­ment separator
  • Skim­mer
Wind­mill Hol­steins Farms - Bio­gas plant (Cana­da)

Windmill Holsteins Farms Biogas Plant Canada

Year Feed
2016 7,500 tonnes/yr organ­ic waste
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Process Scheme & Design
  • Machine inte­gra­tion
  • Machine deliv­ery
  • Com­mis­sion­ing
  • Ball valve pump KV20
  • Dou­ble-tube heat exchanger
  • Hyg­e­niza­tion tanks for food waste
Miller Waste Inc. Pick­er­ing - Pro­cess­ing plant (Kana­da)

Miller Waste Inc. Pickering - Pre-Processing Facility Kanada

Year Feed
2016 20,000 tonnes/yr munic­i­pal organ­ic waste
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Process Scheme & Design
  • Machine inte­gra­tion
  • Machine deliv­ery
  • Com­mis­sion­ing
  • Ball valve pump KV20
  • Sep­a­ra­tion Press BS20
Mary­land Bio­gas - bio­gas plant (Kana­da)

Maryland Biogas - Biogas Plant Canada

Year Feed
2016 15,000 tonnes/yr munic­i­pal organ­ic waste
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Process Scheme & Design
  • Machine inte­gra­tion
  • Machine deliv­ery
  • Project man­age­ment
  • Com­mis­sion­ing
  • 2x ball valve pump KV20
  • Dou­ble-tube heat exchanger
  • Hyg­e­niza­tion tanks for food waste
  • Floor scraper
  • Sed­i­ment separator
  • Skim­mer
Bio­gas Plant Jiangjin (Chongqing) - Pro­cess­ing plant and fer­men­ta­tion (Chi­na)

Jiangjin (Chongqing) Biogas Plant - Pre-Processing and Digestion China

Year Feed
2016 75,000 tonnes/yr; Con­t­a­m­i­nat­ed restau­rant waste.
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Pre­lim­i­nary design
  • Engi­neer­ing Services
  • Machine deliv­ery
  • PLC pro­gram­ming
  • Com­mis­sion­ing
  • 4x sep­a­ra­tion press BS20
  • 4x floor scraper
  • 4x Skim­mer
  • Bicar­bon­at Ana­lyz­er APAS
Bayview Bio­gas - San­i­ta­tion and Dis­charge Sys­tem (Cana­da)

Bayview Biogas - Pasteurizer and Cantaminants Removal Canada

Year Feed
2015 3,500 tonnes/yr grape pomace; 2,500 tonnes/yr food waste
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Process Scheme & Design
  • Machine inte­gra­tion
  • Machine deliv­ery
  • Project man­age­ment
  • Dou­ble-tube heat exchanger
  • Bicar­bon­at Ana­lyz­er APAS
  • Wall mount­ed Skimmer
KBA Hard - Sed­i­ment dis­charge sys­tem (Switzer­land)

KBA Hard - Sediment Removal Equipment Switzerland

Year Feed
2015 Food waste
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Machine deliv­ery
  • Com­mis­sion­ing
  • Floor scraper
Lan­gage Farm AD - Machines for sub­strate clean­ing (Unit­ed Kingdom)

Langage Farm AD - Equipment for Substrate Fine Cleaning United Kingdom

Year Feed
2015 18,000 tonnes/yr restau­rant food waste
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Machine deliv­ery
  • 2x sep­a­ra­tion press BS20
  • hydraulic pow­er unit
BAVA Garmisch-Partenkirchen - Bio­gas plant (Ger­many)

BAVA Garmisch-Partenkirchen - Biogas Plant Germany

Year Feed
2014 10,000 tonnes/yr; Munic­i­pal organ­ic waste and com­mer­cial food­waste from gro­cery stores, restau­rants and food processors.
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Approval plan­ning
  • Process Scheme & Design
  • Machine deliv­ery
  • Instal­la­tion
  • Com­mis­sion­ing
  • 2x sep­a­ra­tion press BS20
  • 1x Gate Valve Pump KP10
  • 2x dou­ble tube heat exchanger
  • Floor scraper
  • Sed­i­ment separator
  • Skim­mer
Bioren­der - Pre-Pro­cess­ing Facil­i­ty (Switzer­land)

Biorender - Pre-Processing Facility (Switzerland)

Year Feed
2012 5,000 tonnes/yr; Com­mer­cial food waste from gro­cery stores, restau­rants and food processors
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Process Scheme & Design
  • Machine deliv­ery
  • Instal­la­tion
  • Sep­a­ra­tion Press BS20
  • Sed­i­ment separator
HEM Ener­gy - Trans­fer sys­tem for organ­ic waste (Swe­den)

HEM Energy - Transfer system for organic waste (Sweden)

Year Feed
2012 10,000 tonnes/yr; Con­t­a­m­i­nat­ed gro­cery and restau­rant food waste
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Machine deliv­ery
  • Instal­la­tion
  • Com­mis­sion­ing
  • Sep­a­ra­tion Press BS20
Lan­gage Farm AD - Bio­gas plant (Unit­ed Kingdom)

Langage Farm AD - Biogas plant (United Kingdom)

Year Feed
2011 18,000 tonnes/yr restau­rant food waste, manure, 713 kWel.
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Process Scheme & Design
  • Machine deliv­ery
  • PLC pro­gram­ming
  • Com­mis­sion­ing
  • Dou­ble-tube heat exchanger
  • 3x Floor scraper
  • Sed­i­ment separator
  • 3x skim­mer
Agroen­ergie Bergmasche S.C.A. - Waste­water treat­ment plant (Italy)

Agroenergie Bergmasche S.C.A. Italy

Year Feed
2011 215 m³/d cen­trate water from diges­tate de-watering
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Process Scheme & Design
  • Con­struc­tion management
  • PLC pro­gram­ming
  • Com­mis­sion­ing
Bio­gasan­lage Buch­holz - Pro­cess­ing plant (Lux­em­bourg)

Buchholz Biogas Plant Luxemburg

Year Feed
2011 5,000 tonnes/yr; Food waste and bio-waste and 2,550 tonnes/yr agri­cul­tur­al sub­strates, 270 kWel.
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Pre­lim­i­nary design
  • Process Scheme & Design
  • Machine deliv­ery
  • Instal­la­tion
  • PLC pro­gram­ming
  • Com­mis­sion­ing
  • Sep­a­ra­tion Press BS20
  • Floor scraper
  • Sed­i­ment separator
  • Skim­mer
Biopow­er Bernau GmbH & Co. KG - Bio­gas plant (Ger­many)

Berthelsdorf Biogas Plant Germany

Year Feed
2009 10,000 tonnes/yr; Energy
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Approval plan­ning
  • Process Scheme & Design
  • Con­struc­tion management
  • PLC pro­gram­ming
  • Com­mis­sion­ing
Bioen­ergie Schlit­ters - Bio­gas Plant (Aus­tria)

Bioenergie Schlitters Austria

Year Feed
2008 10,000 tonnes/yr; Munic­i­pal SSO, gro­cery store, restau­rant food waste
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines
  • Pre­lim­i­nary design
  • Approval plan­ning
  • Process Scheme & Design
  • Machine deliv­ery
  • PLC pro­gram­ming
  • Com­mis­sion­ing
  • Sep­a­ra­tion Press BS20
  • 2x Floor scraper
  • Sed­i­ment separator
  • Skim­mer
Biopow­er Bernau GmbH & Co. KG - Bio­gas plant exten­sion (Ger­many)

Biopower Bernau Germany

Year Feed
2004, 2000 6,000 tonnes/yr; Munic­i­pal SSO, restau­rant food waste
FIN­STER­WALDER work packages Used FIN­STER­WALDER machines

2004

  • Process Scheme & Design
  • Machine deliv­ery
  • Instal­la­tion
  • Con­struc­tion management
  • Com­mis­sion­ing

2000

  • Approval plan­ning
  • Process Scheme & Design
  • Instal­la­tion
  • Con­struc­tion management
  • PLC pro­gram­ming
  • Com­mis­sion­ing
  • Sep­a­ra­tion Press
  • Dou­ble-tube heat exchanger
  • Floor scraper
  • Sed­i­ment separator
  • Skim­mer

Lat­est news

Instal­la­tion Progress at Entsorgungs­be­triebe Lübeck

The pro­cess­ing line with our robust and reli­able BS20 sep­a­ra­tion press now is installed with a cus­tomised steel struc­ture. The hydrauli­cal­ly oper­at­ed sep­a­ra­tion press effi­cient­ly sep­a­rates the non-fer­mentable frac­tions of almost any waste. It is impor­tant to have a...

News from Lübeck

  Next step at Entsorgungs­be­triebe Lübeck! Upload­ing and installing the 45 qm Ves­sel. For this pur­pose, a part of the plant roof was tem­porar­i­ly removed, the ves­sel was brought in from the roof open­ing and fixed in place. Thanks to all for the excellent...

Kick-off Entsorgungs­be­triebe Lübeck

Project start and kick-off meet­ing at Entsorgungs­be­triebe Lübeck for the new con­struc­tion of a pro­cess­ing tech­nol­o­gy for food waste! Dur­ing this vis­it, those involved in the project were able to get to know each oth­er bet­ter and ini­tial goals, mile­stones and other...

Fin­ster­walder Umwelt­tech­nik now on Youtube

On this chan­nel videos are pub­lished, which show solu­tions as well as infor­ma­tion about our process­es and indi­vid­ual com­po­nents in the field of bio­gas tech­nol­o­gy. Just have a look and subscribe! 

MB con­nect line User Conference

Net­work­ing, exchange of know-how among the par­tic­i­pants, accom­pa­nied by tech­ni­cal pre­sen­ta­tions and user reports - that is the goal of the MB con­nect line user con­fer­ence! On board are cus­tomers from mechan­i­cal and plant engi­neer­ing and build­ing automa­tion as well as...

Inter­est­ing Suc­cess Sto­ry from MB con­nect line

Dig­i­tal­iza­tion for process opti­miza­tion of bio­gas plants with remote access and IOT appli­ca­tion from MB con­nect line: Con­tin­u­ous mon­i­tor­ing of mea­sured val­ues dur­ing ongo­ing oper­a­tion allows con­clu­sions to be drawn about the plant and process sta­tus via remote...

Start of con­struc­tion work at Vil­la Avo­ca­do, Mexico

Work has start­ed on the con­struc­tion of a plant with a capac­i­ty of 650 cubic meters raw bio­gas per hour! The Mex­i­can com­pa­ny, based in Guadala­jara, is a world leader in the pro­duc­tion of avo­ca­do oil and the devel­op­ment of avo­ca­do prod­ucts. In the man­u­fac­tur­ing of...

Report on the com­pact depack­ag­ing plant

Bio­enger­gy Insight 1st issue with focus on Europe. We are pleased to see the inter­est­ing arti­cle on the real­iza­tion of the Fin­ster­walder com­pact treat­ment plant at David­son Envi­ron­men­tal, Cana­da. Read the whole arti­cle: You can find even more inter­est­ing reports and...

Vis­it us on Linkedin

Here you will find reg­u­lar­ly inter­est­ing infor­ma­tion and solu­tions about anaer­o­bic diges­tion of organ­ic waste. Fol­low us!

Expan­sion of the project in Lana/Bolzano

For the anaer­o­bic diges­tion plant in Lana/Bolzano, which has been in oper­a­tion since 2007, an expan­sion and mod­ern­iza­tion was decid­ed in 2018. The design and imple­men­ta­tion of the con­ver­sion by Fin­ster­walder Umwelt­tech­nik into an inno­v­a­tive mod­el plant was...

Events

IFAT 24 Munich

Save the Date! 13-17.05.2024 Munich Trade Fair. Vis­it us at booth 345 in hall A4! Arrange your per­son­al appoint­ment in advance. Sim­ply fill out the con­tact form and enter your pre­ferred date! We look for­ward to see­ing you!

ECOMON­DO 2023 in Rimini

This year's ECOMON­DO, the green tech­nol­o­gy trade fair, starts on 7 Novem­ber in Rim­i­ni. Vis­it us at the Ger­man Pavil­ion in Hall 5, Block 71 . We look for­ward to inter­est­ing dis­cus­sions and per­son­al con­tacts! You will find us in Hall 5, Block 71. www.ecomondo.com...

Pol­lutec 2023 in Lyon

Pol­lutec 2023 in  Lyon France 10th to 13th Octo­ber As part of our par­tic­i­pa­tion at the joint stand of Bay­ern Inter­na­tion­al, we will be on site at this year's Pol­lutec, a major inter­na­tion­al show­case for inno­v­a­tive solu­tions and proven prac­tices in the environmental...

Lec­ture: Inno­v­a­tive small-scale bio­gas plant

At the 9th Annu­al Con­fer­ence "Con­struc­tion and Oper­a­tion of Com­mer­cial Kitchens and Com­pa­ny Cater­ing 2023", every­thing will revolve around trends and effi­cien­cy in the sec­tor. As part of the exten­sive pro­gramme, Dr. Michael Meir­er, Rhein­tal­gas Asso­ci­a­tion, and Tobias...

Pol­lutec 2023 in Lyon

From 10 to 13 Octo­ber 2023, the envi­ron­men­tal and ener­gy solu­tion show will take place again in Lyon, and we will be there at the joint stand of Bay­ern Inter­na­tion­al. We look for­ward to inter­est­ing dis­cus­sions and per­son­al con­tacts! Mark your cal­en­dar now!...

ECOMON­DO 2022

On Novem­ber 8 this year's  ECOMON­DO The green Tech­nol­o­gy Expo starts in Rim­i­ni. We will be there, at the joint booth of Bay­ern Inter­na­tion­al. We are look­ing for­ward to inter­est­ing con­ver­sa­tions and per­son­al con­tacts! You will find us in hall 5, block 71....

Pre­sen­ta­tion at the Hach Waste­water Sym­posia 2022

On 20.09.2022 in Ben­sheim and 11.09.2022 in Munich, Dipl.-Ing. Tobias Fin­ster­walder will give a pre­sen­ta­tion on "Con­tin­u­ous sed­i­ment dis­charge from digesters dur­ing oper­a­tion" as part of the Hach Waste­water Sym­posia. Fur­ther infor­ma­tion at www.hach.com

IFAT Munich 2024

After a 3-year break, IFAT 2022 was the per­fect event to wel­come our cus­tomers and inter­est­ed guests at our booth at the world's lead­ing trade fair for water, sewage, waste and raw mate­ri­als man­age­ment. We are now already look­ing for­ward to IFAT 2024. From 13 - 17 May...

IBBK BIO­GAS # HANDS ON

BIO­GAS # HANDS ON Online Train­ing of IBBK BIO­GAS from Feb­ru­ary 22 to March 15, 2022. The "pro­Bio­gas Inter­na­tion­al" pro­gram is divid­ed into 14 mod­ules. With­in the frame­work of the mod­u­lar online cours­es and inter­ac­tive work­shops, expe­ri­enced bio­gas experts will impart...

AHK busi­ness trip USA

From the 23rd to the 27th of Sep­tem­ber the AHK busi­ness trip will take place in the west (Cal­i­for­nia, Sacra­men­to) and south (Flori­da) of the USA. Here Ger­man com­pa­nies have the oppor­tu­ni­ty to inform them­selves about the mar­ket poten­tial in the field of bioen­er­gy in...
WordPress Cookie Plugin by Real Cookie Banner