Imple­men­ta­tion of reme­di­al mea­sures

The fuse char­ac­ter­is­tics of a mea­sure or a tech­ni­cal sys­tem are always the result of our EMIS­SIONS LIM­IT ANALY­SIS with DIMEN­SIONS accord­ing to site-spe­cif­ic spec­i­fi­ca­tions. We exam­ine on a con­sis­tent basis the pos­si­ble vari­ants that meet the legal, qual­i­ta­tive and tech­ni­cal require­ments accord­ing to the state of sci­ence and tech­nol­o­gy. For the approval and exe­cu­tion plan­ning, we decide togeth­er with the tech­ni­cal author­i­ty and the client for the vari­ant that rep­re­sents the best com­pro­mise between the eco­log­i­cal and eco­nom­ic tar­gets. Once the “BEST SOLU­TION” is found, we set the qual­i­ty require­ments for the build­ing mate­ri­als and sys­tems. After the release of the con­struc­tion has tak­en place, our basics devel­oped in the design pro­cess­ing are imple­ment­ed in the course of exe­cu­tion pro­cess­ing in instruc­tions for the con­struc­tion and doc­u­ment­ed in the con­text of qual­i­ty assur­ance. The qual­i­ty fea­tures spec­i­fied in the plan­ning must be adhered to in the con­struc­tion work. We car­ry out the inspec­tion again with the emis­sion lim­it val­ue analy­sis by eval­u­at­ing the qual­i­ty assur­ance data for the con­struc­tion work. The results show that over the entire “life­time” of a site, e.g. B. land­fill con­struc­tion, even under super­po­si­tion of the unfa­vor­able pos­si­ble con­di­tions, the eco­log­i­cal tar­gets are met with cer­tain­ty.

With the EMIS­SIONS LIM­IT ANALY­SIS, we can RELI­ABLY assess the cur­rent con­di­tion and pro­vide a BELIS­SI­BLE STATE­MENT of the future emis­sion behav­ior into the aquifer, regard­less of the dura­tion.

OUR PLAN­NING SER­VICES

  • Togeth­er with the par­tic­i­pants (tech­ni­cal author­i­ties), we deter­mine the con­di­tions of the evi­dence and pro­vide the basics
    the basics.
  • We plan and mea­sure the back­up / refur­bish­ment mea­sures regard­less of the type of con­struc­tion, tak­ing into account the
    spe­cif­ic require­ments of the site.
  • We com­pare the secu­ri­ty sys­tems offered on the mar­ket on a con­sis­tent basis and com­bine
    the effec­tive­ness with the costs for any appli­ca­tion and appli­ca­tion areas.
  • We car­ry the required proof of emis­sion safe­ty for your loca­tion.
  • We bal­ance the eco­log­i­cal and eco­nom­ic tar­gets.
  • We devel­op a reli­able cal­cu­la­tion of invest­ment, oper­at­ing and con­struc­tion costs.
  • We exam­ine the need for fol­low-up (includ­ing mea­sures, dura­tion and costs).

Lat­est news

AHK busi­ness trip USA

From the 23rd to the 27th of Sep­tem­ber the AHK busi­ness trip will take place in the west (Cal­i­for­nia, Sacra­men­to) and south (Flori­da) of the USA. Here Ger­man com­pa­nies have the oppor­tu­ni­ty to inform them­selves about the mar­ket poten­tial in the field of bioen­er­gy in...

Round table: Land­fills

On 12.07.2019 from 10:00 - 13:00 a round table on "Land­fills: aspects of legal reg­u­la­tion, financ­ing and work orga­ni­za­tion in Ger­many" will take place in the Min­istry of Nat­ur­al Resources and Envi­ron­ment of the Russ­ian Fed­er­a­tion. The speak­er is our man­ag­ing direc­tor...

BIO­GAS # HANDS ON

The BIO­GAS # HANDS ON Train­ing of IBBK BIO­GAS takes place from 07.05.2019 to 15.05.2019. This 7-day train­ing is IBBK's pre­mi­um course. The many years of expe­ri­ence of the Ger­man bio­gas experts in the con­text of this train­ing allows the world­wide trans­fer of knowl­edge...

load­ing map - please wait...

Fin­ster­walder Umwelt­tech­nik GmbH & Co. KG: 47.828045, 12.343537
Fitec Envi­ron­men­tal Tech­nolo­gies Inc.: 42.995663, -79.265639
Fitec (Tian­jin) Envi­ron­men­tal Tech­nol­o­gy Co., Ltd.: 39.142200, 117.177000