Projects & Pub­li­ca­tions

Reac­tor Land­fill Tec Bianch (CH) • Part A

Opin­ion Gas drainage on the slag body • Part A: Methane emis­sions Stage IV-A (Switzer­land)

Cus­tomer:
Cor­po­razione dei Comu­ni del Moe­sano per la rac­col­ta e l’eliminazione dei rifiu­ti (CRER), Rovere­do (Switzer­land)
Scope:
Report
Exe­cu­tion time:
2015
Con­trac­tu­al rela­tion­ship:
Con­trac­tor / Con­sul­ta­tion

Reac­tor Land­fill Tec Bianch (CH) • Part B

Opin­ion gas drainage on the slag body • Part B: Hydro­gen gas emis­sions (Switzer­land)

 

Client: cpro­ject inge­nieure gmbh Scope of ser­vices: Emis­sion lim­it val­ue analy­sis with DESi Vari­a­tion on the amount of ground­wa­ter pol­lu­tion Exe­cu­tion time: 2014 Con­trac­tu­al rela­tion­ship: Expert report for a prop­er­ty plan­ner, spe­cial­ist plan­ning “Emis­sion assur­ance”

Rat­ing Land­fill loca­tion (CH)

Basics for the eval­u­a­tion of land­fill sites

Cus­tomer:
Fed­er­al Office for the Envi­ron­ment, Depart­ment of Waste and Raw Mate­ri­als (BAFU), Bern

Scope:
Exper­tise on the basics

Exe­cu­tion time:
2014

Con­trac­tu­al rela­tion­ship:
Apprais­er for a Fed­er­al Office

Restora­tion TPH dam­age (AT)

 

Ren­o­va­tion con­cept in-situ ven­ti­la­tion for petrol sta­tion loca­tions

 

Cus­tomer:
AECOM / URS Deutsch­land GmbH, branch office Aus­tria, Graz (Aus­tria)

Scope:
Restruc­tur­ing plan

Exe­cu­tion time:
2015

Con­trac­tu­al rela­tion­ship:
Con­trac­tor / Con­sul­ta­tion

Old deposit Wannsee (DE)

Suit­abil­i­ty and func­tion­al­i­ty of the water house­hold lay­er

Cus­tomer:
cpro­ject inge­nieure gmbh

Scope:
Emis­sion lim­it analy­sis with DESi Vari­a­tion on the lev­el of ground­wa­ter pol­lu­tion

Exe­cu­tion time:
2014

Charge­able con­struc­tion costs:

Con­trac­tu­al rela­tion­ship:
Expert report for a prop­er­ty plan­ner Spe­cial­ist plan­ning “Emis­sion assur­ance”

Lat­est news

AHK busi­ness trip USA

From the 23rd to the 27th of Sep­tem­ber the AHK busi­ness trip will take place in the west (Cal­i­for­nia, Sacra­men­to) and south (Flori­da) of the USA. Here Ger­man com­pa­nies have the oppor­tu­ni­ty to inform them­selves about the mar­ket poten­tial in the field of bioen­er­gy in...

Round table: Land­fills

On 12.07.2019 from 10:00 - 13:00 a round table on "Land­fills: aspects of legal reg­u­la­tion, financ­ing and work orga­ni­za­tion in Ger­many" will take place in the Min­istry of Nat­ur­al Resources and Envi­ron­ment of the Russ­ian Fed­er­a­tion. The speak­er is our man­ag­ing direc­tor...

BIO­GAS # HANDS ON

The BIO­GAS # HANDS ON Train­ing of IBBK BIO­GAS takes place from 07.05.2019 to 15.05.2019. This 7-day train­ing is IBBK's pre­mi­um course. The many years of expe­ri­ence of the Ger­man bio­gas experts in the con­text of this train­ing allows the world­wide trans­fer of knowl­edge...

load­ing map - please wait...

Fin­ster­walder Umwelt­tech­nik GmbH & Co. KG: 47.828045, 12.343537
Fitec Envi­ron­men­tal Tech­nolo­gies Inc.: 42.995663, -79.265639
Fitec (Tian­jin) Envi­ron­men­tal Tech­nol­o­gy Co., Ltd.: 39.142200, 117.177000